Tonaquint Data Centers, Inc. established 2008 in St. George, UT. TDC offers over 20,000 sq. ft. of data center space in our current facility located in the Tonaquint Business Park.
Facility Size: Approximately 28,000 square feet
Completed: 3rd Quarter, 2008.
Raised floor area is 17,200 usable square feet.
Floor Load: Typical structural capacity of 1250 pounds per square foot.
Building Access: 24x7x365,
Building Security: Video surveillance at all building entrances Shipping and receiving dock with remote monitored gate and secured storage Private parking area for all emploees and customers Monitored visitor parking
Telecommunications: 360 Networks UTOPIA Tonaquint Qwest Interlinx South Central Level(3) Communicatoins Integra Telecom
Commercial Power: Utility Power 25MW primary substation 15MW secondary substation Total power plant 4MW
Fuel Tank: Fuel storage for minimum 48-hr run time. Currently, 6,000+ gallons on site.
Generators: Three (3) 2MW Caterpillar generators and eight (8) 750KVA Liebert UPS units. Entire generator plant designed at N+1 redundancy.
Fire Supression: FM200 VESDA (Very Early Smoke Detection Alarm) above and below floor. Double interlock pre-action throughout.
HVAC: DX30 ton computer room air conditioner units. N+1 redundancy on all systems.
Ceiling Heights: Typically finished 10 feet from raised floor.